amada logo amada logo
Amada de Mexico Logo
  • Empresa
    • Centro Técnico de Monterrey
    • Carolina Manufacturing Center
    • Carolina Technical Center
    • Brea Manufacturing Center
    • Los Angeles Technical Center
    • Schaumburg Solution Center
  • Productos
    • Sistemas de Corte Láser
    • Punzonadoras de Torreta
    • Combinación Láser  y  Punzón
    • Prensas Dobladoras
    • Sistemas de Automatización
    • Automatización de Doblez
    • Soldadura por Láser de Fibra
    • Herramental
    • Fabricación General
    • Estampado
  • Software
    • Software Products
    • Actualizaciones de Software
    • Soporte de Software
    • Videos Tutoriales
  • AMADA School
  • Financiamiento
  • Contactos
social media tagline
  • facebook page
  • twitter page
  • twitter page
  • linkin page
  • instagram page
Cerrar
Amada America Logo
Back
Cerrar
Amada America Logo
Back
Cerrar
Oportunidades de Empleo
mexico page down arrow
usa logo canada page
amada logo mexico page amada logo
  • usa logo
  • canada page
Oportunidades de Empleo
  • Inicio
    Centro Técnico de Monterrey
    Carolina Manufacturing Center
    Carolina Technical Center
    Brea Manufacturing Center
    Los Angeles Technical Center
    Schaumburg Solution Center
  • Productos
    Sistemas de Corte Láser
    Punzonadoras de Torreta
    Combinación Láser y Punzón
    Prensas Dobladoras
    Sistemas de Automatización
    Automatización de Doblez
    Soldadura por Láser de Fibra
    Herramental
    Fabricación General
    Estampado
  • Software
    Software
    Actualizaciones de Software
    Videos Tutoriales
  • AMADA School
  • Financiamiento
  • Contactos
  • Amada Logo

    Sinergia en acción a traves de diversas tecnologías

    • AMADA MACHINERY AMERICA
    • AMADA WELD TECH
    • AMADA PRESS SYSTEM AMERICA
    • AMADA MACHINERY AMERICA
    • AMADA WELD TECH
    • AMADA PRESS SYSTEM AMERICA

    ¡Nos emociona compartir que AMADA PRESS SYSTEMS AMERICA se está integrando oficialmente con AMADA AMERICA!

    Esta acción nos permite ofrecer una experiencia más ágil para nuestros socios y clientes, brindando una visión completa de nuestras soluciones de estampado y fabricación. Actualmente, estamos cargando los productos de estampado en nuestro sitio.

    Mientras tanto, se proporciona el siguiente enlace:
    AMADA PRESS SYSTEM AMERICA

< back
bottom

Technical Notes

 
Fanuc Laser Maintenance Schedule

 

AMADA Service Department Customer Support -- Tech Note: L020

Applies to: Pulsar, Altair, Delta, Apelio Laser Machines With Fanuc Lasers.
Last updated: January 06, 1997.

CATALOG

Regular Laser Maintenance Schedule

Periodic Laser Maintenance Schedule

 

REGULAR LASER MAINTENANCE SCHEDULE

The following maintenance must be performed regularly for trouble-free operation of the laser. However, be sure to replace components per the schedule in the Periodic Maintenance in the next section.

Item Period Instructions
1.
Laser Gas Pressure Daily Check that the primary regulator pressure is greater than 10 kgf/cm2. If not, replace the gas cylinder.
2.
Vacuum Pump Oil Weekly Confirm that the oil level is between the min and max
levels with the machine in standby mode. If the oil
level falls bellow the min level, replace the oil. Note
that the oil must be replace every 6 months or 1500
hours of operation.
3.
Vacuum Pump Oil Leak Weekly Check that no oil has leaked on the frame of the
vacuum pump, especially around the drain cock. If a
leak is apparent, replace the exhaust filter as it is
likely to be clogged. Note that the filter must be
replaced every year or 3000 hours of operation.
4.
Turbine Blower Oil Weekly Confirm that the oil level is between the min and max
levels with the machine in standby mode. If the oil
level falls bellow the min level, replace the oil. Note
that the oil must be replace every 4 months or 1,000
hours of operation
5.
Turbine Oil Leak Weekly Check that no oil has leaked on the frame of the
vacuum pump, especially around the drain cock. If a
leak is apparent, locate the source. Call service if the
leak is coming from anywhere other than an open
drain cock.
6.
Laser Output Power Weekly If the power level inside the laser resonator falls
bellow acceptable levels, a warning message number
4085[685] is displayed. Clean resonator optics or
replace them as necessary.
7.
Chiller Water Weekly Check the water quality. If the color changes
considerably, drain and refill the chiller with clean
distilled water and additive. Note that the water and
the additive must be replace every 1 year of
operation. If water additive is not used, the distilled
water must be replace every 2 months.

 

ˆ Top ˆ

 

 

PERIODIC LASER MAINTENANCE SCHEDULE

The table below lists the periodic maintenance of the laser resonator components. The operational hours are indicated on the hour meter on the resonator. When two periods are given (ie: 6 months or 1500 hours) use the lower value.

Item Period
1.
Clean Output Coupler Mirror Every 6 months, or when "4085 Mirror is Dirty" alarm is displayed , or if the laser beam mode is distorted.
2.
Clean Rear Mirror Every 6 months, or when "4085 Mirror is Dirty" alarm is displayed , or if the laser beam mode is distorted.
3.
Clean Fold Mirrors Every 6 months, or when "4085 Mirror is Dirty" alarm is displayed.
4.
Clean Zero-shift Mirror Every 2 months, or power decreases (depending on situation).
5.
Replace Output Coupler Mirror Every year or if the laser beam mode is distorted.
6.
Replace Rear Mirror Every year, or when "4085 Mirror is Dirty" alarm is displayed.
7.
Replace Fold Mirrors Every year, or when "4085 Mirror is Dirty" alarm is displayed.
8.
Replace Zero-shift Mirror Every year, or power decreases (depending on situation).
9.
Replace Vacuum Pump Oil Every 6 months or 1,500 hours
10.
Replace Vacuum Pump Filters Every year or 3,000 hours
11.
Overhaul Vacuum Pump Every 3 years or 10,000 hours
12.
Change Turbine Blower Oil Every 4 months or 1,000 hours
13.
Overall Turbine Blower Every 4 years or 12,000 hours
14.
Change Exhaust Filter Every 2 years or 1,500 hours
15.
Replace Gas Pressure Control Filter Every 2 years or when contaminated or with control problems
16.
Replace Laser Tube O-rings Every 2 years or when internal leak apparent
17.
Chiller Water Every year if additive used, or every 2 months if additive not used or when water quality deteriorates.
18.
Clean Water Tubes Every year
19.
Warning Beacon Light Every 3,000 hours or when faulty
 
top

AMADA patrocina con orgullo a:

amada spark force
amada sponsors page 2
amada sponsors page 3
  • Página de Inicio
  • |
  • calendario de eventos
  • |
  • Contacta con Nosotros
  • |
  • Política de Privacidad

Copyright© 2026 AMADA DE MÉXICO. Todos Derechos Reservados.